Construction method(4.5) - List of Manufacturers, Suppliers, Companies and Products

Construction method Product List

1~4 item / All 4 items

Displayed results

Construction method "Teracell TX Method"

Effective for uneven settlement! Foundation construction method for structures on weak ground.

The "TerraCell TX Method" is a new method for preventing uneven settlement of structural foundations constructed on weak ground. It allows for simple and quick installation. The restraining effect of TerraCell and the double dispersion effect of Tri-Axis are effective against uneven settlement. Please feel free to consult us if you have any requests. 【TerraCell Product Specifications】 ■ Model: T-300LPH ■ Cell Size: 45.0cm × 50.0cm ■ Dimensions (H×W×L): 300mm × 2.50m × 1.80m ■ Area when deployed: 4.5m² *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "Eco Speed"

Environmentally friendly with even faster work speed!

"Ecospeed" is a new gas pressure welding method that uses the polymer reducing agent "PS Ring." By using natural gas, it is possible to reduce environmental impact and improve the reliability of the welding work. Additionally, since it does not require a reducing flame, the operation can be done manually, and the entire process can be heated with a standard flame. 【Features】 ■ Oxidation prevention with PS Ring ■ A-class joint performance ■ Environmentally friendly ■ Improved reliability of welding work ■ Uses natural gas *For more details, please refer to the catalog or feel free to contact us.

  • Steel
  • Fittings

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Low-altitude head-down-the-hole hammer method LH-DH method

Down-the-hole hammer method under low ceilings, under bridges for railways and roads, and under power lines!

We would like to introduce our "Low-Headroom Down-the-Hole Hammer Method LH-DH Method." Using a driving device to rotate the down-the-hole hammer and bit, the piston inside the hammer cylinder is moved back and forth by air supplied from a high-pressure compressor. This movement causes the bit tip to strike and break stones and rock formations, while the excavated soil is removed using a screw and air lift method. To prevent wear and seizure inside the cylinder due to piston movement, it is necessary to spray oil into the air using a line oiler. 【Construction Examples (Partial)】 ■ LH-DH Method ・Height restriction: 4.55m (under special high-voltage lines) ・Steel material: H250 L=7.5 to 9.5m joint pile construction ・Construction machinery: RX2300 low-headroom construction machine, special auger for low headroom AGD7000 *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration